Simplified design of prestressed concrete tanks for potable water PAS 015 If the building information system
$84.00
Description
If the building information system (BIS) is accessible by the EnMT
Optional backseat test
BS 7000-4 gives guidance on the management of the construction design process at all levels
The requirement for flashpoint has been deleted and the requirement for relative density has been replaced by one for density at 20 °C
The length of cable (or fibre) on each side of the connector set is 2 m minimum
Simplified design of prestressed concrete tanks for potable water PAS 015 If the building information system
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.