910-10480 Walthers HO GP9 -- SF #748 Track Prototypes handle fuel oil
$169.99
Description
Prototypes handle fuel oil
Some of these cars had side and end ladders cut down
60' Pullman-Standard Flatcar - Ready to Run -- Trailer-Train VTTX #92214 (20' & 40' Container Loading
single-bay car with a 70-ton capacity
Some functions are limited in DC
910-10480 Walthers HO GP9 -- SF #748 Track Prototypes handle fuel oilThe Walthers Mainline Phase II High Hood GP9 is a must have model for your first generation diesel roster! Outwardly similar to the earlier GP7, and sharing the same boxy, no frills body with its high, short hood, minor production changes in the number and placement of louvers on locomotives built from 1955 to 1957 resulted in what modelers and railfans refer to as "phase two" GP9s. Like it's prototypes, many still going strong today, the Walthers
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 20.00
US$ 24.00
US$ 26.00
US$ 16.00
US$ 28.00
US$ 18.00
US$ 20.00
US$ 16.00
US$ 22.00
US$ 16.00
US$ 20.00
US$ 70.00