Guidelines for in-service inspections for primary coolant circuit components of light water reactors - Eddy current testing of steam generator heating tubes Ingestion-build-105964 Updated figures and tables
$116.00
Description
Updated figures and tables
parameters or practices quoted in the main body to values and methods used in the country
various particular and optional requirements
BS ISO 4254-9 also specifies the type of information on safe working practices (including residual risks) to be provided by the manufacturer
Each SC in TC86 has already created documents on reliability
Guidelines for in-service inspections for primary coolant circuit components of light water reactors - Eddy current testing of steam generator heating tubes Ingestion-build-105964 Updated figures and tables1 Scope This document gives guidelines for pre service inspection (PSI) and in service inspections (ISI) by eddy current tests on non ferromagnetic steam generator heating tubes of light water reactors, whereby the test is carried out using mechanised test equipment outwards from the tube inner side. An in service eddy current test of steam generator heating tube plugs as a component of the primary circuit is not an object of this document. Owing to
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.